300-115 SWITCH Implementing Cisco IP Switched Networks
Exam Number 300-115 SWITCH
Associated Certifications CCNP Routing and Switching CCDP
Duration 120 minutes (45-65 questions)
Available Languages English
Register Pearson VUE
Exam Policies Read current policies and requirements
Exam Tutorial Review type of exam questions
Additional Resources
Implementing Cisco IP Switched Networks (SWITCH 300-115) is a qualifying exam for the Cisco CCNP Routing and Switching and CCDP certifications. The SWITCH 300-115 exam certifies the switching knowledge and skills of successful candidates. They are certified in planning, configuring, and verifying the implementation of complex enterprise switching solutions that use the Cisco Enterprise Campus Architecture.
Exam Description
Implementing Cisco IP Switched Networks (SWITCH 300-115) is a 120-minute qualifying exam with 45‒55 questions for the Cisco CCNP Routing and Switching and CCDP certifications. The SWITCH 300-115 exam certifies the switching knowledge and skills of successful candidates. They are certified in planning, configuring, and verifying the implementation of complex enterprise switching solutions that use the Cisco Enterprise Campus Architecture.
The SWITCH exam also covers highly secure integration of VLANs and WLANs.
The following topics are general guidelines for the content that is likely to be included on the exam. However, other related topics may also appear on any specific version of the exam. To better reflect the contents of the exam and for clarity, the following guidelines may change at any time without notice.
Need CCENT, CCNA or CCNP Study Tools to prepare for your exams? A Cisco Learning Network Premium Subscription is the ultimate resource for CCENT, CCNA Routing and Switching, and CCNP self-study.
1.0 Layer 2 Technologies 65%
1.1 Configure and verify switch administration
1.1.a SDM templates
1.1.b Managing MAC address table
1.1.c Troubleshoot Err-disable recovery
1.2 Configure and verify Layer 2 protocols
1.2.a CDP, LLDP
1.2.b UDLD
1.3 Configure and verify VLANs
1.3.a Access ports
1.3.b VLAN database
1.3.c Normal, extended VLAN, voice VLAN
1.4 Configure and verify trunking
1.4.a VTPv1, VTPv2, VTPv3, VTP pruning
1.4.b dot1Q
1.4.c Native VLAN
1.4.d Manual pruning
1.5 Configure and verify EtherChannels
1.5.a LACP, PAgP, manual
1.5.b Layer 2, Layer 3
1.5.c Load balancing
1.5.d EtherChannel misconfiguration guard
1.6 Configure and verify spanning tree
1.6.a PVST+, RPVST+, MST
1.6.b Switch priority, port priority, path cost, STP timers
1.6.c PortFast, BPDUguard, BPDUfilter
1.6.d Loopguard and Rootguard
1.7 Configure and verify other LAN switching technologies
1.7.a SPAN, RSPAN
1.8 Describe chassis virtualization and aggregation technologies
1.8.a Stackwise
2.0 Infrastructure Security 20%
2.1 Configure and verify switch security features
2.1.a DHCP snooping
2.1.b IP Source Guard
2.1.c Dynamic ARP inspection
2.1.d Port security
2.1.e Private VLAN
2.1.f Storm control
2.2 Describe device security using Cisco IOS AAA with TACACS+ and RADIUS
2.2.a AAA with TACACS+ and RADIUS
2.2.b Local privilege authorization fallback
3.0 Infrastructure Services 15%
3.1 Configure and verify first-hop redundancy protocols
3.1.a HSRP
3.1.b VRRP
3.1.c GLBP
Best Cisco CCNP Training and, Cisco 300-115Exam at certkingdom.com
QUESTION 1
What is the maximum number of switches that can be stacked using Cisco StackWise?
A. 4
B. 5
C. 8
D. 9
E. 10
F. 13
Answer: D
Explanation:
QUESTION 2
A network engineer wants to add a new switch to an existing switch stack. Which configuration
must be added to the new switch before it can be added to the switch stack?
A. No configuration must be added.
B. stack ID
C. IP address
D. VLAN information
E. VTP information
Answer: A
Explanation:
QUESTION 3
What percentage of bandwidth is reduced when a stack cable is broken?
A. 0
B. 25
C. 50
D. 75
E. 100
Answer: C
Explanation:
QUESTION 4
Refer to the exhibit.
Which set of configurations will result in all ports on both switches successfully bundling into an
EtherChannel?
A. switch1
channel-group 1 mode active
switch2
channel-group 1 mode auto
B. switch1
channel-group 1 mode desirable
switch2
channel-group 1 mode passive
C. switch1
channel-group 1 mode on
switch2
channel-group 1 mode auto
D. switch1
channel-group 1 mode desirable
switch2
channel-group 1 mode auto
Answer: D
Explanation:
QUESTION 5
Refer to the exhibit.
How can the traffic that is mirrored out the GigabitEthernet0/48 port be limited to only traffic that is
received or transmitted in VLAN 10 on the GigabitEthernet0/1 port?
A. Change the configuration for GigabitEthernet0/48 so that it is a member of VLAN 10.
B. Add an access list to GigabitEthernet0/48 to filter out traffic that is not in VLAN 10.
C. Apply the monitor session filter globally to allow only traffic from VLAN 10.
D. Change the monitor session source to VLAN 10 instead of the physical interface.
Answer: C
Explanation: